Blog
ProductGuidePhase 233D ReconstructionEngineeringResearchMEP Takeoff

Phase 23 — Estimated Floor, Scale, and Height So a Live 3D Graph Can Persist

Teraquant Team3 min read
STATUS: LIVE_GRAPH_PASS (scripted G1–G3, G5). Live file 圖則.pdf (project a48e6815-cbbf-4847-a68b-57b87ee53bd0 / file 65b1bfde-5049-49d9-a1f2-70c10058d5dd). Estimated G on 供水平面圖. 8 world fittings/valves. persisted true (building_models 3b170c3d-…). Lift 8/8 on page-2 located claims. 0 pipe_run. G4 signed-in 3D tab not browser-certified. Assumed 3.15 m is 假設 / 非量度. Estimated G is not a printed 地面層. Not Peak P&D 3D 80/80. Not corpus 80–90%.

This journal copies numbers from docs/PEAK_PHASE23_REPORT.md and apps/web/data/phase23/live-graph-verify.v1.json (generatedAt 2026-08-19T18:22:22.456Z). Nothing was re-scored for publication. Phase 22 left 7/7 renders and 88 claims with an empty building because unnamed 平面圖 was blocked and persist 500d on a missing table. Phase 23 estimates parameters so a graph can store. It does not draw fake centerlines.

What is estimated

MissingEstimateLabel
Floor on unnamed 平面圖G估算 — not a printed 地面層
Storey height3.15 m假設 / 非量度
Plan scale if missing1:100預設 — not measured

Existing / 僅供參考 plans are not a second storey. 系統圖 stay schematic. Empty titles stay empty — extract summaries that mention 平面圖 must not invent floors 6 and 7. Peak montage titles without crops still do not collapse to a fake single G.

How to rebuild

  • Open the drawing 3D tab. Assumed height is optional; Rebuild still estimates G and 3.15 m if you leave height empty.
  • Use the floor override if the unnamed plan is not ground floor.
  • Amber chips mean 估算/假設/預設. They never flip to 量度.

What is not claimed

Eight fittings are not a pipe network. Lift 8/8 is not 88-claim accuracy and not Peak P&D 3D Detection / QA@20 ≥80%. Phase 24 owns geometric centerlines → pipe_run. G4 (seeing the graph in a signed-in browser) was not certified this wave.