Takeoff YouCan Defend

Upload the drawings and the SOR. AI finds the evidence on every sheet. You confirm before a number leaves the room.

  • Discipline sheets4
  • Draft until you confirm100%
  • Background takeoff24/7
  • Training projects studied21
Scroll
TQ / 01Project deck

Every floor, every bill line, one deck.

The project dashboard reads like a building: storeys stack up, the floor you are measuring lights up, and each Schedule C line shows whether it was measured, counted or still needs you.

Model : Block B

Illustrative

Active storey

5F

Measured
Counted
To confirm
01Fan coil unit, ceiling typeCounted
0228 mm copper, chilled waterMeasured
03Gate valve, 25 mmTo confirm
TQ / 02

Upload. Find. Confirm.

  1. 01

    Upload

    Drop MEP PDFs and the SOR xlsx. Each drawing maps to the right sheet: P&D, FS, MVAC, or EL&ELV. Empty sheets never silently fall back to plumbing.

  2. 02

    Find

    Count items go through legend takeoff. Metre items go through geometric centreline. Text OCR alone does not invent pipe length.

  3. 03

    Confirm

    Claims stay draft until Claim Review. No evidence, no quote line. Every keep or correct is in the audit trail.

TQ / 03

Built around the bill, not a dump of boxes.

TeraQuantSPECIMENM-201P-201FS-201P 2/7SCALE 1:100SCHEDULE C : MVAC4.12風機盤管nr35.03Ø28 mm 銅喉m-5.02Ø22 mm 銅喉m-6.18閘閥 25 mmnr-7.04壓差開關nr-5 / 37 ROWSTHIS ROW風機盤管3 nr · this pageDRAFTEVIDENCE IN THIS FILEp.1p.2p.3p.4p.5p.6SHEETM-201FLOOR2/FMETHODlegendSTATEDRAFTTQ M-201 001123456ABCDPLANT 1.01LOBBY 1.02STORE 1.03MEETING 1.042600340031002300123Ø28 CHWSØ22 CHWR24.0 mLEGENDFCUGATE VALVECHWSDIFF.LEGEND : 4 SYMBOLSMVAC 2/FDWG M-201SCALE 1:100REV BSPECIMEN

Bill to drawing

Select a Schedule C row. Matching instances light on this page. Empty match stays selected and does not dim the sheet.

02

Page-scoped evidence

Pins and polylines belong to the current page. Other pages never paint junk on page one.

03

Geometric length

Scale 1:N centreline polylines in metres. N.T.S. sheets are skipped, never reported as 0 m.

04

Discipline sheets

AC drawings read MVAC. FS stays FS. P and D share P&D. Prefix order is AC / FS / EL before bare P or D.

05

Rotate-aware PDF

Rotated sheets swap display width and height so overlays sit on the symbols.

06

Audit trail

Who confirmed, which page, which location. Built for tender queries, not a screenshot folder.

TQ / 04

Stop tracing every corner.

CostX, Bluebeam, and Glodon TME still ask a surveyor to snap every junction on a Windows desktop. TeraQuant runs in the browser. Click a bill item. See the instance on the sheet.

01 : LEGACY

Desktop giants

Windows install. Local files. Manual snap and trace. Excel-grade formulas in CostX. Markup-first in Bluebeam. Structure bills in Glodon TME.

02 : TERAQUANT

TeraQuant

Browser on Mac or Windows. MEP PDF plus SOR workbook. Item-first evidence on the current page. Humans confirm before a number leaves the room.

Togal and Kreo auto-measure rooms and finishes. We bind MEP symbols and pipe runs to Schedule C lines.

TQ / 05

What this is, and what it is not.

Hong Kong MEP tender takeoff on 2D PDFs. Verification-first. Evidence you can open in a meeting.
Not CostX 5D BIM. Not Glodon structural quantities. Not Togal-style residential floor-area in one click. Research metrics live on the blog, not as a hero percentage.
TQ / 06LOD-G

3D graph, CIC LOD-G 300 and LOD-G 400

The MEP 3D graph targets CIC BIM Standards – General LOD-G 300 (overall size and location) and LOD-G 400 (installation hangers and fasteners). CIC BIM Standards – General is the ISO 19650-aligned parent standard, with the Hong Kong Local Annex.

Floor-to-floor joins, hangers, fasteners, and generic family types are estimates. They are not measured lengths and not a named manufacturer.

Full statement on the product page

See it on your own pack.

Create an account, or book a walkthrough on your own drawings and SOR.