Product

MEP takeoff that proves every quantity

TeraQuant connects Peak-style PDF drawings to Schedule of Rates lines, extracts MEP symbols with vision AI, and reconciles AI quantities against Peak-SOR ground truth on Schedule C—with evidence pinned to the drawing.

Input
PDF + SOR xlsx
Evidence
Page overlays
Extract
Vision + geometry
Verify
Schedule C

Capabilities

Built for verification-first MEP takeoff

From drawing upload to Schedule C reconciliation—one workflow that keeps quantities, evidence, and SOR lines connected.

  • PDF + SOR takeoff

    Upload Peak-style PDF drawings and Schedule of Rates workbooks. Map each drawing to the right discipline sheet—P&D, FS, MVAC, or EL&ELV—and run takeoff against the real tender structure.

  • Evidence-linked overlays

    Every claim pins back to the drawing. CAD-like PDF viewing with page-scoped evidence boxes, polylines, and audit-ready locations so quantity review stays grounded in the source.

  • AI vision extraction

    Vision models read MEP symbols, labels, and counts from plan sheets. Extraction writes structured claims with confidence and evidence links—not free-text guesses.

  • Schedule C vs Peak-SOR

    Compare AI quantities to Peak-SOR ground truth on Schedule C. See match, miss, and variance per line so tender verification is measurable, not subjective.

Workflow

From PDF to verified quantities

A linear takeoff path designed for QS review: ingest, extract, evidence, then Schedule C comparison.

  1. 01

    Ingest drawings & SOR

    Load PDF plan sheets and Peak-SOR xlsx. Discipline inference routes each file to the correct Schedule of Rates sheet.

  2. 02

    Extract with vision

    Run page extract or legend takeoff. AI locates MEP symbols and quantities; geometric takeoff measures pipe runs in metres.

  3. 03

    Link evidence on CAD

    Claims overlay the PDF in display coordinates. Select a line to pin evidence, review bboxes, and keep page-scoped audit trails.

  4. 04

    Reconcile Schedule C

    Side-by-side AI qty vs Peak-SOR ground truth. Close the loop on tender quantities with match stats per SOR line.

Drawing workspace

CAD-grade PDF viewing with claim overlays

Page-scoped evidence, selected claim pins, and Schedule C side panel—so takeoff never drifts from the drawing.

P 06–GF–PD · Schedule C · Peak-SOR P&D

FV-12 · qty 1

Display coords · page 1 · 1:100

Page claims

  • Gate valve 65mm

    4 nr

  • FV-12 fire valve

    1 nr

  • CU pipe Ø22

    18.4 m

  • WS meter

    2 nr

Schedule C

  • PD-2.1

    AI 4 · Peak 4

  • PD-3.4

    AI 1 · Peak 1

  • PD-5.2

    AI 18.4 · Peak 19.0

Peak-SOR ground truth on the drawing's discipline sheet only.

Next step

See takeoff with audit trail live

Create an account for the projects dashboard, or book a walkthrough of PDF ingest, vision extract, evidence overlays, and Peak-SOR Schedule C comparison.