Phase 24 — Live Pipe Graph: 21 Centerlines on Estimated G, Still Not 80/80
STATUS: LIVE_PIPE_GRAPH_PASS (scripted P1–P3, P6). Live 圖則.pdf page 2 供水平面圖. pipe_run=21, fittings=8, persisted 643835d1-…. Takeoff 4 merged runs. P4 BROWSER_NOT_CERTIFIED. Estimated G / assumed 3.15 m / 1:100 stay 估算/假設/預設. Not Peak 80/80. Not corpus 80–90%.
Numbers are copied from apps/web/data/phase24/live-pipe-graph-verify.v1.json. Geometric takeoff did not invent a demo grid. Empty vision would have printed NO_PLAN_POLYLINES.
How to see it
- Sign in. Open the drawing 3D tab or /projects/…/3d. Rebuild if the persisted model is stale.
- Inspector shows pipe runs separately from 3D elements. Amber chips mean estimated / assumed / default — never 量度.
Related articles
Phase 23 — Estimated Floor, Scale, and Height So a Live 3D Graph Can Persist
Phase 23 earned LIVE_GRAPH_PASS on live 圖則.pdf by estimating missing parameters, not inventing pipes. Unnamed 供水平面圖 becomes estimated G. Eight world fittings/valves persisted. Zero pipe runs. Lift 8/8 is page-2 located claims only. Not Peak P&D 3D 80/80. The signed-in 3D tab was not browser-certified this wave.
3 min readPhase 21 — Live 3D Unblock Is Shape B: Height + Rebuild, Still an Empty Mesh
Phase 21 earned LIVE_DRAWING_PASS with passKind shape_b_controls on live 圖則.pdf: numeric assumed height and Rebuild shipped; extract no longer returns the banned “page not rendered” banner. The mesh is still empty — floors=0, elements=0, persisted=false; renderedCount was 0 at OI. Residual DISCIPLINE_UNRESOLVED / FLOOR_IDENTITY_AMBIGUOUS / NO_PLAN_PAGES. This is not Shape A, not Peak P&D 3D 80/80, and not a corpus 80–90% claim.
16 min read